Heath Sartini Talks About Carrier Design and the Making of Uni-Frame

The owner of Viking Carriers and co-owner of Uni-Frame talks about designing carriers, rethinking the building’s floor, and making the whole system work for the people who use it.

Spend enough time around a modular factory, and you learn to appreciate the people who ask inconvenient questions early. Everybody likes the bigger floor plan and the taller ceiling. Then somebody asks, “How are we going to get it out of here?”

That is a conversation I enjoy. It takes a design off the conference table and puts it in the hands of the people who have to build it, move it, and unload it. Suddenly, a few inches underneath the house become everybody’s business.


Heath Sartini, Chief Executive Officer

Heath Sartini spends his time working through those details. As the owner of Viking Carriers and one of the owners of Uni-Frame, he approaches a new carrier by asking what the factory actually needs it to do. The module’s dimensions and weight are only the beginning. The trip through the yard, the road journey, and the unloading process all shape the design.

I wanted to hear how that process works, especially when the assignment becomes as ambitious as Uni-Frame. As Heath explains it, the building’s structural floor becomes part of the transportation system, with the running gear positioned behind the building. The design brings the house closer to the road and opens up possibilities that deserve a factory owner’s attention.

It also raises some wonderfully practical questions. How do you lift something that sits that low? How do you support it while removing the transportation assemblies? And how do you make the connections manageable for the driver who has to use them?

Heath agreed to walk me through the thinking behind a conventional carrier and then explain what it took to develop Uni-Frame. 

Here is our conversation:

Gary Fleisher: When someone asks Viking Carrier to design a carrier, where do you start?

Heath Sartini: Before we draw anything, we need to understand the size and weight of the modules: their typical length, width, and weight, along with the range the carrier will need to accommodate.

We also need to know how the factory plans to use it. Will it move modules out of the production building, carry them into the storage yard, transport them to the job site, or handle all three? Those uses can require different designs, so we start by understanding the entire process.

Gary: What makes designing a carrier more complicated than simply making it strong enough to hold a module?

Heath: Strength is only one part of the design. We also have to consider ride height, support locations, weight distribution, outrigger reach, turning clearance, and how the module will be loaded and unloaded.

For example, a perimeter-framed building may place much more weight on the outriggers than a building supported closer to the center. That changes how we design the carrier and its supports.

We also need to determine whether the carrier must stretch to accommodate different building lengths. If it will travel on public roads, we have to consider its loaded dimensions and whether it can retract to legal dimensions for the empty return trip. All of those requirements influence the design.

Gary: What was the original assignment for Uni-Frame, and how did it differ from a conventional carrier?

Heath: The goal was to achieve a 5-inch ride height by making the frame part of the building itself. With Uni-Frame, the structural frame serves as the floor of the house and as part of the transportation system.

That is completely different from placing a finished module on a conventional trailer. Instead of positioning the wheels and axles underneath the building, the running gear sits behind it. That arrangement allows the building to travel much closer to the road.

Gary: How did you and Daryl Snader work out where the Uni-Frame structure’s job ends and the carrier’s job begins?

Heath: We approached it as two parts that have to work together. The Uni-Frame remains with the building as its structural floor, while the transportation assemblies provide the lifting, suspension, and running gear needed to move it.

The frame itself requires considerable attention because it must support the building and handle the stresses of highway transportation. We have to account for building weight, camber—the upward curve built into the frame—and flex. Our design target is less than an inch of deflection to help protect the building during transportation.

On the carrier side, the connections between the transportation assemblies and the frame are especially important. They must be strong enough for highway use while also allowing drivers to connect and disconnect efficiently. Making that transition practical for the people using it is a major part of the design.

Gary: Can you walk us through one specific Uni-Frame design challenge?

Heath: One major challenge was figuring out how to lift and unload the building without a crane while maintaining the low ride height.

Our solution uses a custom suspension design that provides approximately 15 inches of lift at both the front and rear. That allows the building to be supported on low cribbing while the transportation assemblies are removed.

For example, the system allows us to use low cribbing made from 2-by-4 or 2-by-6 lumber instead of the roughly 34-inch-high crib stacks commonly needed when unloading from a traditional trailer. Reducing that cribbing requirement and enabling unloading without a crane are two of the biggest potential savings.

Gary: How do you verify that a new design will perform as intended?

Heath: We start with computer simulations of the Uni-Frame to evaluate how the design responds to weight in different locations and the forces it will encounter during transportation. 

We also load-test the equipment at our facility, placing weight in specific areas to evaluate its behavior.

Then we build a prototype and test it under actual operating conditions. Simulations are valuable, but real-world use can reveal things that are difficult to capture on a computer. We use those observations to make adjustments and refine the design. 

That combination of analysis, physical testing, and operating experience is essential to our process.

Gary: What would you tell a factory owner who asks what Uni-Frame will change and whether it will save money?

Heath: The biggest change is that the building’s floor system becomes part of the transportation structure. The floor joists and frame serve both purposes, changing how the factory builds, supports, and moves the module.

The 5-inch ride height provides more than two additional feet of buildable height compared with a conventional carrier setup. A factory can use that space to expand its building designs while managing overall transportation height.

The system can also reduce or eliminate the need for conventional carriers in the operation it is designed to serve. At the job site, the lifting system reduces the need for tall cribbing and allows unloading without a crane.

Factories would need to incorporate the Uni-Frame into their building process and adapt their handling procedures around it. We expect the biggest benefits to come from carrier costs, unloading equipment, setup time, and greater design flexibility. 

The lower transportation height may also reduce height-related permit requirements, depending on the building and route. The actual dollar savings and time savings still need to be measured through everyday use.

Gary’s Observation

Gary Fleisher, modcoach@gmail.com

What I like about Heath’s answers is how often they come back to the person doing the work. The driver needs to connect and disconnect the equipment. The crew needs room to support the building and remove the transportation assemblies. The factory needs a system that fits its production and handling procedures. Those are the details I want to hear when somebody brings a new idea into this industry.

The low ride height will understandably get attention. I am just as interested in what happens when the truck stops. Heath’s description of the lifting system and lower cribbing makes me want to watch the unloading process from start to finish, with the crew explaining each step. That is where a factory owner can begin to see how the concept might fit an actual operation.

Heath also leaves us with a useful distinction between the benefits the team expects and the savings still to be measured in everyday use. I would look forward to seeing those results—crew hours, equipment needs, handling time, and how the factory adapts its floor construction. Each delivery should give the team more to learn from.

For me, Uni-Frame is worth following because it asks the industry to reconsider something we work around every day. We spend a great deal of effort deciding what goes inside a modular home. Heath and the team are giving us a reason to take a closer look underneath it.

Thank you, Heath, for walking us through the engineering and the practical thinking. I suspect you have given a few factory owners something to discuss on their next trip through the yard.

No comments: