A Typical Shift in the Life of a Modular Factory

Put a few modular factory owners around a breakfast table and ask how interest rates are affecting business. You’ll get some thoughtful answers. Ask if anybody has ever had a customer move a light switch after the drawings went to production. Somebody will set down his coffee so he can tell the story with both hands.

After spending more than half my life around this industry, I have a theory about that. An owner can remember what high interest rates did to his business. He can remember the name of the woman who moved that switch. Especially if she called back the next morning and asked him to put it back where it was.

Come spend an imaginary Tuesday with me. If you run a modular factory, there’s a fair chance you’ve already had this Tuesday.

Move it Just Four Inches

Our homeowner would like the switch moved four inches to the left so she can hang a mirror by the front door. Fair enough. She’ll walk past that mirror every day, and somebody at the sales office tells her it should be an easy change. It probably was an easy change on Friday, when the wall existed only on a screen. This morning, an electrician is standing in front of it.

The project manager goes looking for him. Design revises the plan. Somebody has to find the paper copy clipped to the job cart before the next shift uses it. Meanwhile, the homeowner has one more question. Did anybody see the picture of the tile she sent last night?

Purchasing opens the attachment. It’s a screenshot of a bathroom with lovely blue-green walls, a little heart in the corner, and no manufacturer’s name. The buyer knows exactly where to find the white subway tile the customer picked six weeks ago. He can see it from his desk.

Three drawings and a football score

Down at the floor table, a crew leader has found something worth stopping for. The framing plan shows joists at 16 inches on center. An engineering detail shows 19.2. The sheet on the cart shows 24. All three carry the same job number. The crew leader takes them to his supervisor and asks a perfectly reasonable question. “Which one do you want me to get yelled at for building?”

While engineering sorts that out, the supervisor sends two people ahead to lay out a wall. They get as far as a window opening before one of them notices the missing dimension. The supervisor pulls out his tablet to check the latest set. He gets one bar by the table, two by the aisle, and a perfectly good signal in the breakroom, where the television has been replaying Sunday’s football highlights without interruption.

Here’s what I like about that crew leader. He was willing to be the fellow who stopped the floor. Had he picked whichever spacing looked familiar, everybody could have enjoyed a lovely morning right up until somebody measured what they’d built.

According to the computer, we have plenty

By lunch, somebody needs to explain how 32 sheets of OSB became 18. Receiving has a signed ticket for 32. The inventory screen agrees. The fellow standing at the rack invites anybody who believes the screen to come down and help him count.

Eventually somebody remembers borrowing 14 sheets for a rush job. At the time, it was the neighborly thing to do. A crew needed material, another crew had it, and nobody wanted to hold up a house over a little paperwork. Today the crew that lent it needs it back. Try entering “Ask around, somebody owes us” in the inventory system.

The lumber delivery is easier to reconcile. We ordered 36 premium 2x6s, and the driver brought all 36. Thirty can go straight to the wall table. Four need a charitable second opinion. One would make a handsome rocker if we ever got into the furniture business. The last one is worth keeping for the next time the salesman comes by and asks why we’ve been buying lumber somewhere else.

The house is ready. How’s the road?

By afternoon there’s a finished module in the yard. It passed inspection, the carrier is ready, and the transport permit still says “processing.” The builder calls because he has a crane and a set crew to schedule. He’d appreciate a date. So would everybody else on the call.

We’ve spent years telling people about the advantages of building indoors, and I’ll happily tell them again. I would, however, like to invite whoever first called modular construction weatherproof to spend a windy morning with a crane operator. Once that module goes through the big door, Mother Nature gets a vote. She’s particularly fond of exercising it after the hotel cancellation deadline.

Back inside, the replacement torque wrench arrives. Anyone who has ever bought a replacement tool knows what happens next. The original turns up in a drawer that three grown men distinctly remember checking.

Gary’s Observation

Gary Fleisher, modcoach@gmail.com

What would bother me about that Tuesday, sitting in the owner’s chair, is how respectable it might look by quitting time. Engineering settled the joist spacing. Somebody found more sheathing. The wall got built, the switch got moved, and we’re up one torque wrench. At the morning meeting, I might even thank everyone for pulling together. They earned it.

Then I’d ask the supervisor which of those problems he remembers from last Tuesday. That’s the conversation I’d want to stick around for. If the wall crew keeps getting old drawings, the person who changes the file upstairs ought to walk downstairs once and see where the old copies live. He might learn more in ten minutes at that job cart than he did in the last three production meetings.

I still like the people in this business best at the end of a day like that. Somewhere there’s a supervisor heading home who spent an entire shift finding answers for other people. Ask him how his day went and he’ll probably say, “Pretty good. Got the floor framed.” Give him a minute, though. He’ll want to tell you about that board.

1 comment:

  1. Good article Gary. We would hold a pre-production meeting every morning at the start of the day w/ Production, Purchasing, Sales, Engineering. The goal was to be sure EVERYONE was on the same page (materials needed, change orders, drawings, etc.) regarding the next house hitting the line. If there was an issue(s) it was sorted out BEFORE we started pounding nails. It was amazing what a 10-20 minute meeting can solve prior to the home hitting the production line.